Replace Fire Pumps at Buildings 2305 and 2307, Vandenberg AFB
MS2 completed design/build improvements to the fire suppression pump system at Buildings 2305 and 2307 (NRO). Work included design and replacement of existing pumps, piping, motors, and other appurtenances required for a complete and functional fire suppression pump system. MS2 also investigated the current piping configuration between the pumphouse and the fire hydrants at Building 2500.