Chemistry and Biology Building, University of Wisconsin-Stevens Point, WI
OTIE provided structural design engineering for a new $59.7M, 172,800-square-foot, four-story chemistry and biology facility. The new facility includes a vehicle delivery/loading area, pedestrian open spaces connecting to the existing pedestrian mall, a new steam pit and tie-in to existing campus services. The new facility will include instructional and research laboratories, classrooms, offices, and public spaces designed around “Science on Display.” The new facility was designed for LEED Gold certification, and construction was completed in June 2018.